|
|
THE MANAGEMENT
 |
Anuar Omar
Manager
Academic Qualification :
Double Degree
Bachelor of Science in Marine Engineering and Bachelor of Science in Mechanical Engineering.
1987, Carlifornia Maritime Academy, USA.
Working Experience :
1986 - 1987
Maintenance Engineer in Carlifornia Maritime Academy, USA.
1988 - 1993
Contract Engineer, Kejuruteraan Semangat Maju Sdn Bhd.
Promoted to Manager of Industrial Mechanical Systems
Division. Responsible for technical back-up and management of
sales team.
Set-up R&D Division including first Acoustic Laboratory in
Malaysia. Testing made under BS 4718 : 1971, ISO 140 and
Australian standard on silencers, doors and walls.
Major Acoustic Projects :
Design and Built 16dB(A) Sound Room
at Matsushita Bangi, Selangor Darul Ehsan (1991).
Design and Built 27dB(A) Sound Room
at Matsushita Shah Alam, Selangor Darul Ehsan (1992).
Installation of Acoustic insulation for Turbine
at ESSO Production Malaysia Inc. 'Tiong A' Platform
off-shore Terengganu (1993).
Designed and install 6 x 1MVA genset
for Chunghwa Picture Tube Power Plant (1994).
Designed and install Central Plant 1MVA Generator Set Room
for KLCC (1995).
Designed 5 x 1875 kVA and 2 x 1875 kVA for KLCC Tower 1 & 2
respectively (1996).
Acoustic seminars attended :
Noise and Vibration Conference
at National University of Singapore (1990).
Advance Acoustic study
by Sound and Vibration Technology at Kuala Lumpur (1991).
Euro-Noise Conference
Imperial College of London (1992).
|
|
 |
Felicia Lai Mei Ying
Marketing Manager
Academic Qualification
Completed LCCI (Higher) in Accounting,
Stamford Group of Colleges, Petaling Jaya
Working Experience
1988-1989
Personnel Assistant, Kelab Rekreasi TUDM, Subang.
Responsible for human resources, welfare and payroll
(recruitment staff of over 100 personnel).
1989-1993
Administrative Assistant, Kejuruteraan Semangat Maju Sdn Bhd
Promoted to Contracts Executive of Industrial Mechanical
Systems Division. Responsible for marketing and design of
acoustic system for generator set and building air-conditioning
which includes installation.
1995-1996
Promoted to Marketing Manager of the same division to be
responsible on the marketing of acoustic product in a new
untapped market.
Major Projects
Designed and install air-conditioning acoustic system
Nikko Hotel, Ampang (1994).
Designed and install generator set acoustic system
Phoenix Plaza, Cheras (1994).
Designed and install generator set acoustic system
Samsung Seremban 2 x 2.5 MVA (1993).
Designed and install generator set acoustic system
Ampang Specialist Centre (1994).
Designed and install generator set acoustic system
MEASAT Langkawi (1995).
|
|
|